Plumbing routes in a light steel house should be coordinated with the floor and wall framing before it is fabricated. Start with the largest drain and vent lines, then work through water supply and access requirements. This gives the framing designer time to compare the service layout with the joist direction, wall depth and locations of structural connections.
Start with the drains and wet rooms
Show the fixture positions and proposed drain route on the same drawing as the floor joists. A gravity drain needs a continuous route with enough depth for its fall and fittings. If the route crosses several joists, the design team can compare a service wall, a ceiling bulkhead or a revised fixture position before committing to the framing layout.
Identify penetrations and access on the drawings
Give the framing team pipe outside diameters, fitting dimensions and penetration locations. Ask the designer to identify the service holes or alternative routes permitted by the framing details. A change on site should go back to the designer for review before a structural member is cut. Also show where installers need access to valves and cleanouts after the wall or ceiling is closed.
Send ESS Engineering your framing plans and a fixture or plumbing layout to review the points where services meet the structure.